Smooth cubic Hermite curve synthesised from IEC class parameters. For greater accuracy, use the turbine library.
Credit deducted only on a successful calculation.
Complete Step 3 (Calculate AEP) first to unlock financial analysis.
| Scenario | CF (%) | CAPEX ($/kW) | WACC (%) | LCOE ($/MWh) | NPV (M$) | IRR (%) |
|---|
To progress from pre-feasibility to bankable assessment, these studies are typically required:
| Study | Duration | Purpose |
|---|---|---|
| Met mast / LiDAR campaign | 12–24 mo | On-site hub-height wind data for MCP |
| Wind flow modelling (CFD / WAsP) | 2–4 mo | Micrositing, wake & terrain energy |
| Measure-Correlate-Predict (MCP) | 1–2 mo | Long-term adjust via reference station |
| Geotechnical survey | 1–3 mo | Foundation design, soil, roads |
| Grid connection study | 2–6 mo | POC, grid capacity, cable routing |
| Environmental & Social IA | 6–18 mo | Permitting, habitat, community |
| Noise & visual impact | 2–4 mo | Setback, shadow flicker |
| Aviation & telecoms | 1–3 mo | Radar, flight, radio clearance |
| Land lease / acquisition | 3–12 mo | Surface rights, access, consent |
| Bankable energy yield | 2–3 mo | Independent P50/P90 (IEC-accredited) |
Complete Step 4 (Financial Analysis) first to unlock the site access study.
| Factor | Value | Unit rate | CAPEX adder ($/kW) |
|---|
| Metric | Base (country CAPEX) | Site-adjusted | Change |
|---|
Complete Step 3 (Wind Resource Analysis) first to unlock environmental screening.
| Constraint | Search radius | Red < | Amber < |
|---|---|---|---|
| Protected areas | 25 km | 2 km | 10 km |
| Settlements | 5 km | 500 m | 2 km |
| Airports | 15 km | 3 km | 8 km |
| Military zones | 10 km | 1 km | 5 km |
| Wetlands / water | 5 km | 1 km | 3 km |
| Severity | Category | Name | Distance | Detail |
|---|